The building was originally designed and built without balconies, the customer decided to modernize the building.
System: steel construction of hinged balconies with tinted glass railings.
Single-chamber double-glazed window with energy-saving glass.
Location:
Bergen op Zoom, the Netherlands
System:
W62
Area:
windows 800 m²
balconies 150 m²
balconies 150 m²
Year:
2021